Sunday, December 7, 2008
November 23: San Francisquito Cyn to Dowd Cyn Inventory

Friday, November 21, 2008
Nov 15 Back In Dowd Canyon

I was out with Steve Henrich and a crew of volunteers on Saturday for followup work. A reporter from the Antelope Valley Press accompanied to take photos and do interviews.
Tuesday, July 29, 2008
Bear in Camp

Tuesday, April 8, 2008
Misc Places
- Ray Drasher reports clearing all blowdowns between the sag pond southbound to Burnt Peak Junction. That includes the ones the PCTA volunteers didn't get in the Horse Camp area.
- I walked the very upper portion of Spunky Canyon on March 16 and can report that it looks in good shape.
- While not in Sec E, a crew of PCTA / American Hiking Society volunteers led by Dave Fleischman did some great work in Sec D at Vasquez Rocks two weeks ago. They installed waterbars and a great set of stone steps. Much of the park burned in a fire last year, so so re-signing was also called for. I was out on Saturday and helped with some finishing touches. Some photos are here.
Monday, March 24, 2008
Horse Camp
Pete and a crew of PCTA volunteers worked to clear blowdowns at Horse Camp last week, but a few remain across the trail above the camp and so another project will be planned this spring to complete the trail-clearing.
Thursday, February 28, 2008
Dowd Canyon Feb 25

This week, Pete and a volunteer crew brushed and cleared 0.29 miles of trail in a single day! Status map now shows just 1.22 miles remaining to brush in Dowd Canyon.
ALSO: Pat Aubuchon reports working the northbound stretch above the Green Valley FS last month, with TrailBosses. Section E has awesome volunteers!
Tuesday, February 19, 2008
Bouquet Canyon - Southbound



I hiked up to Pelona Ridge on Sunday - one of my favorite local hikes, and hikeable all winter. This stretch would be a good candidate for some improvements to the ORV traps. While the south side of the ridge gets the worst of the ORV traffic, this side still has had all four traps circumvented. These photos show the traps in place, but they could use some shoring up. This would be a good one- or two-day project.
Sunday, February 17, 2008
Tejon Ranch Update
Ray Drasher reports that he rode the Tejon Ranch segment yesterday and cut out the fallen trees (like this one) including a few more since my last inventory. Ray also reports that the segment needs treading in places, as the winter weather has done more tread damage since the October inventory. Sounds like a candidate for re-inventorying before it gets hot. This stretch burned in the 2004 Pine Fire, so we'll continue to have work. Big thanks to Ray for this report!
Friday, February 15, 2008
Feb 9 in Dowd Canyon!


Now that we're beyond midway between access points, it's once again a short walk to get to the work. Here's the status map (everything in green or purple is at least cleared, and much of it treaded), and the customary group photo. Also it was great to get to work with Ian McGarrough again, he made that awesome sign in Bouquet Canyon last year, and helped a lot at Trevor's Eagle Project workday last month. Section E has awesome volunteers!
Tuesday, January 22, 2008
Eagle Project at Horse Camp

Trevor Fry and the rest of Troop 146 of Quartz Hill worked two days at Horse Camp this weekend. I was there as well, and found a bunch of blowdowns along the trail. Here is a slideshow of photos.
Saturday, January 12, 2008
Jan 12 in Dowd Canyon


Pete and Co. will return in a few weeks for more. Congrats to all who have contributed to the progress in the High Desert Runners' adopted stretch of the PCT!
Saturday, January 5, 2008
Jan 5 Dowd Canyon Status